Consultant - Final Project Evaluation MET/UNDP/GEF Strengthening Protected Area Network (SPAN) Project

THE Strengthening the Protected Area Network (SPAN) Project is a six-year project which officially started in 2006 with funding from the Global Environmental facility (GEF) through the United Nations Development Programme (UNDP-Namibia). The project is housed within the Directorate of Parks and Wildlife management of the Ministry of Environment and Tourism (MET). Overall, SPAN was planned to contribute towards the realization of the Namibian Government’s strategic vision for Protected Areas (PAs). SPAN has been designed to be implemented in two phases – during
Phase I (6 years – 2006-2012) interventions include:
  • Strengthening systematic capacity–namely the enabling legal/policy environment and financial mechanisms for PA management
  • Strengthening the institutional capacity for PA management, including partnership with other government agencies, local communities and the private sector, to add to the range of options currently available. These interventions are critical to improve management effectiveness in the PA system as a whole.
Phase II (5 years)
  • Envisaged to build on the successes of Phase I by consolidating the experience and lessons learned in Phase I ensuring that PAs are systematically Mainstreamed into regional and local development, building on the lessons learned and experience gained. Funding for Phase II was not secured and therefore the project will end after Phase I.
The Project Development Goal:
The long-term goal of the SPAN Project is ensuring the sustainable management of renewable natural resources protects biodiversity while contributing to equitable economic and social developmen.
The Project Objective:
The immediate objective of the project is “to increase management effectiveness of the national PA network for biodiversity conservation”.
The Project has three Outcomes, and associated Outputs as listed below:
Outcome 1: Improved systematic capacity provides the enabling framework for enhancing PA management effectiveness (It is worrying that this was not copied correctly):
  • Park and Wildlife management Act and Regulations
  • Park Management Plans
  • Sustainable PA Financing Mechanism
  • Strategic PA Network Plan
  • Systematic Biodiversity Monitoring Mechanism
  • Knowledge Management System
Outcome 2: Institutional capacities for PA management are strengthened, resulting in more effective use of financial and human resources:
  • Structural Reorganization
  • Devolution of Decision making and Financial Management
  • Individual and Park-Level Performance M&E
  • Training and Incentive Mechanisms
  • PA Economics and Business Planning Capacity
  • Partnership Building Capacity
  • HIV/AIDS Succession Planning Capacity
Outcome 3: PA management know-how is expanded and reinforced through innovative field management demonstrations:
  • Field Demonstration Site 1: Ai-Ais Hotsprings Game Park
  • Field Demonstration Site 2: Bwabwata-Mudumu-Mamili Complex
  • Field Demonstration Site 2: Etosha/Skeleton Coast Link
  • Field Demonstration Site 4: Sperrgebiet National Park (combined with field demonstration site 1)

Duties and Responsibilities

While the specific issues of concern are listed in the following paragraphs, a reference to the UNDP programming manual and UNDP/GEF guidelines to conduct final evaluations should be made for addressing the issues not covered below.
The evaluation will include ratings on the following aspects:
  • Sustainability
  • Outcome/Achievement of objectives (the extent to which the projects immediate and development objectives were achieved).

The review team should provide ratings for three of the criteria included in the Final Evaluations:

  • Implementation Approach
  • Stakeholder Participation/Public Involvement
  • Monitoring and Evaluation. The ratings will be based upon the UNDP/GEF six-point scale: Highly Satisfactory (HS), Satisfactory (S), Marginally Satisfactory (MS), Marginally Unsatisfactory (MU), Unsatisfactory (U) and Highly Unsatisfactory (HS).

Project Conceptualization Design:

To identify and acertain the following:

  • Problem was clearly identified and the approach soundly conceived.
  • The target beneficiaries and end-users of the results of the project were clearly identified.
  • The objectives and outputs of the project were stated explicitly and precisely in verifiable terms with observable success indicators.
  • The relationship between objectives, outputs, activities and inputs of the project were logically articulated.
  • If the project started with a well-prepared work-plan and reasons, if any, for deviations.
  • The indicators were SMART.
Project Relevance:
  • Relevance to the development priorities of the country.
  • Given the project objectives, identify appropriate institutions that have been assisted.
Project Implementation:
The evaluation team will examine the quality and timeliness in regard to:
  • The delivery of inputs specified in the project document, including selection of sub-project, institutional arrangements, interest of beneficiaries, the scheduling and actual implementation.
  • The fulfillment of the success criteria as outlines in the project document.
  • The responsiveness of the project management to significant changes in the environment in which the project functions (both facilitating and impeding project implementation).
  • Lessons from other relevant projects if incorporated in the project implementation.
  • The monitoring and backstopping of the project as expected by the Government and UNDP.
  • The delivery of Government counterpart inputs in terms of personnel, premises and indigenous equipment.
  • The project’s collaboration with industry associations, private sector and civil society.
Project Performance:
  • Appropriate project management arrangements.
  • Adequate project resources (financial, physical and manpower) in terms of both quantity and quality.
  • Use of project resources to effectively produce planned results.
  • Was project cost-effective compared to similar interventions.
  • Whether the technologies selected (any innovations adopted, if any) were suitable.
  • The role of UNDP Country Office and its impact (positive or negative) on the functioning of the project.
Results/Success of the project applied to each of the Specific Outcomes and Outputs:
The overall outputs are as defined in the project document that should form the main basis for this evaluation. In addition to the Final targets in the logical framework, the details of the specific impacts to be investigated are:
  • Major achievements of the project vis-à-vis its objectives, outcomes and outputs.
  • Other potential areas could have provided project success? Please explain in detail in terms of impact, sustainability of results and contribution to capacity development.
  • Major issues and problems affected the implementation of the project, and what factors could have resolved them.
  • Given an opportunity, what actions would the evaluation team members recommend to realize actual success.
  • Level of institutional networking achieved and capacity development of key partners, if done in a structured manner at different stages - from inception to implementation.
  • Environmental impacts (positive and negative) and remedial actions taken, if relevant.
  • Social impacts, including impact on the lives of women at each demonstration site.
  • Any underlying factors, beyond control, that influenced the outcome of the project.
Progress towards the project objective and specific outcomes will be rated suing the 6-point UNDP/GEF rating scale.

Competencies

  • Be conversant with administrative/financial/procurement UNDP procedures.
  • Experience in conducting evaluations.
  • Proven ability to write technical reports.
  • Possess excellent interpersonal skills and demonstrated ability to network and foster teamwork.
  • Strong foundation in climate change adaptation programming.
  • Substantive computer knowledge.
  • Experience working in the region is desirable.
Interested individual consultants must submit the following documents/information to demonstrate their qualifications:
I. Proposal:
  • Explaining why you are the most suitable for the work.
  • Provide a brief methodology on how they will approach and conduct the work (if applicable)
II. Financial proposal
III. Personal CV including past experience in similar projects and at least 3 references.

Required Skills and Experience

Education:

  • Masters Degree in Environmental sciences or other related field.
  • Additional years of relevant work experience preferably in combination with a relevant Bachelor's Degree, may substitute for the requirement for a master's degree.

Experience:

  • Minimum five (5) years experience in natural resources and environmental management fields.
  • Substantive work experience with donors and preferably UNDP M&E framework and Result Based Management system, GEF projects and evaluations.

UNDP is committed to achieving workforce diversity in terms of gender, nationality and culture. Individuals from minority groups, indigenous groups and persons with disabilities are equally encouraged to apply. All applications will be treated with the strictest confidence.

Consultant - Final Project Evaluation MET/UNDP/GEF Strengthening Protected Area Network (SPAN) Project
Consultant - Final Project Evaluation MET/UNDP/GEF Strengthening Protected Area Network (SPAN) Project Consultant - Final Project Evaluation MET/UNDP/GEF Strengthening Protected Area Network (SPAN) Project Reviewed by Unknown on 11:35:00 AM Rating: 5

No comments:

JOBS CATEGORY

Tanzania Kenya NGO JOBS Uganda Best Jobs Consultancy Rwanda ICT JOBS Administrative United Nations Sudan Best Jobs Finance Health - Medical Engineering Ethiopia Education Agricultural Lecturer Human Resources Somalia Media Congo - Kinshasa Legal Jobs Bank Jobs Monitoring and Evaluation Mining World Vision Burundi Procurement African Barrick Gold Accountant Zambia Sales and Marketing US EMBASSY East African Community Mozambique Telecoms Research CARE International Save The Children Plan International Arusha Malawi South Sudan Oxfam Scholarships African Development Bank Finance and Administration SafariCom Aviation The Commonwealth American Embassy Sales Zanzibar Environmental Catholic Relief Services Dar es salaam USAID Operations FHI 360 UNDP Security World Bank Economist TradeMark East Africa Unicef Hospitality Managers International Rescue Committee (IRC) Restless Development Accounting Civil Engineers AMREF Morogoro Utumishi AfDB African Development Bank COOPI - Cooperazione Internazionale Driver - Logistics Path International Mwanza African Union Tigo Jobs Marketing Mbeya Teaching Au African Union PSI Population Services International Pwc PricewaterhouseCoopers East African Breweries North Mara Gold Mine ACTED Djibouti Malaria Consortium Bulyanhulu Gold Mine DFID Driver Buzwagi Gold Mine Jhpiego COMESA FINCA JOBS International Jobs Adeso Danish Refugee Council Kilimanjaro Nairobi Coca-Cola Handicap International Pact International Rio Tinto Solidarités International Tender EGPAF Elizabeth Glaser Pediatric AIDS Foundation Logistics Serengeti Breweries Ltd Nation Media Group Africare Norwegian Refugee Council Samaritan's Purse Chemonics International COUNTRY DIRECTOR ICAP of Columbia University InterShips Precision Air RwandAir Marie Stopes International (MSI) Serengeti Breweries Volunteer Climate Change IGAD Tetra Tech ARD Agriculture Jobs Dodoma Iringa One Acre Fund Project Management Clinton Health Access Initiative (CHAI Technoserve Twaweza East Africa ActionAid Lutheran World Federation SADC Secretariat Tanga Vso International ACDI/VOCA Halmashauri Agha Khan Kenya Commercial Bank World Agroforestry Centre Deloitte East Africa International Organization for Migration (IOM) COMESA Secretariat: Software Engineering Safety and Security Shinyanga Jobs Tanzania Breweries Pathfinder International World Health Organization KPMG TANROADS Tanzania Electric Supply Company British Council Futures Group KCB BANK UN-Habitat WFP World Food Programme Barclays GEITA GOLD MINING TANESCO Electrical Engineer Food and Agriculture Organization GOAL Mombasa Tabora WWF World Wide Fund for Nature Microsoft Tanzania Ports Authority East African Development Bank Family Health International (FHI) IBM EAST AFRICA IntraHealth International Mercy Corps SERIKALINI - GOVERNMENT OF TANZANIA AccessBank Community Development Jobs Data Base Management Google Africa ICAP - TZ KEMRI/CDC Program WaterAid Tanzania Auditor SNV International Stanbic Bank Amnesty Horn Relief Kampala Management Systems International (MSI) Standard Chartered Bank VETA Christian Aid DIAMOND TRUST BANK Helen Keller International Help Age Mtwara Uganda Telecom Airtel Africa Equity Bank Internships Marie Stopes TCRA Web Development B B C WORLD SERVICE Human Rights Kigali Makerere University Nile Basin Initiative Kenyatta University Kigoma Mzumbe University NSSF National Social Security Fund Nile Breweries Limited Tulawaka Gold Mine University of Nairobi kenya Airways Bank of Tanzania Graduates MTN Muhimbili National Hospital Nepad Partners in Health Room to Read SUMATRA UNWOMEN African Wildlife foundation (AWF) KEMRI Kagera Librarian MENTOR Initiative Trainee USAILI - INTERVIEW Uiversity of Nairobi WaterAid International icipe Project CAFOD - Catholic Agency for Overseas Development Egerton University EngenderHealth Goal Ireland Kenyan Banks Lake Victoria Basin Commission Peace Corps TANAPA TASAF Tanzania Social Action Fund Zanzibar University ACB AKIBA COMMERCIAL BANK AGRA Alliance for a Green Revolution in Africa Advans Bank Ethiopian Airlines Freedom House IITA International Institute of Tropical Agriculture Legal Moshi NMB BANK Resolute Tanzania Singida Uganda Uganda National Roads Authority University of Dar es salaam University of Dodoma British High Commission ChildFund EWURA FilmAid International NECTA TPDC Tanzania Civil Aviation Authority (TCAA) United States International University World Concern Aga Khan Foundation CBA Commercial Bank of Africa Ecomist Ernst and Young IUCN International Union for Conservation of Nature International Medical Corps Islamic Relief Kakira Sugar Musoma National Institute for Medical Research OPEN UNIVERSITY OF TANZANIA Relief International TAA Tanzania Airports Authority Trócaire Uganda Revenue Authority VODACOM TANZANIA VSF Belgium Architects Hivos IFC International Finance Corporation Ifakara Health Institute Inoorero University International Commercial Bank Kenya Red Cross Society MADEREVA Medical Oil and Gas Pwani University College SOKOINE UNIVERSITY Tumaini University Water Engineering AWF African Wildlife Foundation Acacia Mining Accounts African Virtual University Altima Africa Ardhi University Bank of Uganda Business Development Concultancy Del Monte Kenya Embassies Kenya Airports Authority Lake Victoria South Water Services Board Mara National Bank of Commerce RECORDS MANAGEMENT JOBS RUKWA Ruvuma Search for Common Ground Songea TTCL Tanzania Telecommunications Company Limited Unilever War Child International Zinduka Afrika ACORD AKU ​Aga Khan University Africa Nazarene University Africa Rice Center (AfricaRice) Aga Khan Health Services CRDB BANK Commercial Bank of Africa Daraja Tanzania Engineers Registration Board (ERB) Fina Bank International Potato Center International Potato Center (CIP) Intrahealth Jomo Kenyatta University Kilimanjaro Christian Medical Centre Kyambogo University Lindi Jobs MCL Mwananchi Communications MUHAS-harvad Moi University NBC BANK National University of Rwanda Ngorongoro Conservation Area Authority Njombe Nuru International Nzoia sugar Company RTI International SUA SOKOINE UNIVERSITY OF AGRICULTURE THE LAW SCHOOL OF TANZANIA TRA Tanzania Revenue Authority Tanzania Postal Bank The Foundation For Civil Society Udhamini wa Masomo Western Union AIR TANZANIA Action Against Hunger (ACF) Agricultural Society of Kenya BRALIRWA Bondo University College Caritas Comoros Concern Worldwide Conservation Jobs Consolidated Bank of Kenya DHL Express Ewaso Ngiro South River Basin Development Authority Geologist Gulf African Bank INSTITUTE OF ADULT EDUCATION Jomo Kenyatta University of Agriculture and Technology Kabale University Kabale University (KAB) Kenya Ports Authority KickStart International MORUWASA Morogoro Urban Water and Sanitation Authority MSH Management Sciences for Health Mumias Sugar Company Nairobi Hospital Nkumba University Rural Electrification Agency SOKINE UNIVERSITY SONGWE STAMIGOLD Stores TACAIDS TARURA TCU Tanzania Commission for Universities Tullow Oil World Lung Foundation (WLF) ALAF Limited Aga Khan Development Network (AKDN) Aga Khan Hospital Air Malawi American Refuge Committee BENKI YA POSTA - TPB BANK BTC Belgian Technical Cooperation Bhttp://www.blogger.com/img/blank.gifank of Tanzania Bioversity International CHF International Customer Service Jobs DANGOTE DIT DAR ES SALAAM INSTITUTE OF TECHNOLOGY Danida Dar es Salaam Institute of Technology Daystar University ECOBANK ETDCO Electrical Transmission and Distribution Construction and Maintenance Company European Union IFM INSTITUTE OF FINANCE MANAGEMENT INSURANCE JOBS - BIMA ITECH Internews® Network KUITWA KAZINI Kenya Accreditation Service Kenya Polytechnic University College Kilombero Sugar Company Kisii University College Kisumu Laboratory Jobs MSD MEDICAL STORES DEPARTMENT MSF Switzerland Management Sciences for Health Manyara Maseno University Ministry of State for Planning Muteesa 1 Royal University Médecins Sans Frontières NIDA National Identification Authority Narok University College OSHA Occupational safety and Health Authority Open Society Initiative for Eastern Africa (OSIEA) PA PAC PEPSI POLICE - POLISI Petroleum EngineerS RWANDA HOUSING AUTHORITY Seychelles Songas TBC TANZANIA BROADCASTING CORPORATION TBS TANZANIA BUREAU OF STANDARDS TFDA TANZANIA FOOD AND DRUGS AUTHORITY TIB - Tanzania Investment Bank Tanzania Mortagage Refinance Company Tanzania Teachers’ Union Transmara Sugar Company Tropical Pesticides Research Institute Tumba College of Technology Twiga Cement UNESCO UNOCHA Umma University University WRP Walter Reed Project ZANTEL ao uga
Powered by Blogger.